Pre-cut and pre-core scans for rebar, post-tension cables and conduit. Delivered across Delta by Pipe GPR, a Leak.ca division.
604-239-9934Same-day response in DeltaBefore sawing, coring or drilling into a structural slab, wall or column, GPR scanning identifies the rebar, post-tension cables, conduit and any voids hidden inside. The cost of cutting blind into a PT cable or a live conduit is enormous — both in repairs and in safety. We deliver concrete scans for general contractors, MEP trades, plumbers, electricians and forensic engineers. Marks are placed directly on the surface at the scan, with a thickness estimate where called for. We work in occupied buildings, on tower podiums, and on infrastructure jobs where downtime is unaffordable.
Pre-excavation locates over delta peat, void detection along older fills, concrete scanning for industrial sites.
Delta's built environment — single-family in Ladner and North Delta, low-rise development in Tsawwassen, agricultural and industrial in Tilbury and Ladner farmland — shapes how concrete scanning is delivered locally. Most of Delta sits at or below sea level on the Fraser delta, protected by dykes and pump stations. Water-table issues, slab leaks and stormwater inflow into sanitary systems are recurring themes, and utility work has to respect strict drainage and ALR constraints.
Three sectors, one standard:
Same-day response across Delta. Phone is fastest.